Welcome to our online Plan Room. Please see the bid opportunities below and click on indivdual listings to see more specific details about each. Once you have had an chance to review the details of the project please indicate your bid intent by choosing “YES” or “NO” on each of the opportunities listed. If you have any further questions or need any assistance with our Online Plan Room please call 402.477.6745 or email bids@cheeverconstruction.com for assistance. 

Private Bid Opportunites

User login

Public Bid Opportunites
Work Begins
May 21, 2020
Expected Completion
Aug 01, 2020
Bids Due
Apr 23, 2020
Scope of Work

The project scope includes replacement of the kitchen hood and renovation to a small set of restrooms.  Work is to proceed in late May and conclude by the end of July.

Work Begins
May 11, 2020
Expected Completion
Jun 25, 2021
Bids Due
Apr 16, 2020
Scope of Work

Cheever Construction will be accepting bids for the UNL Architecture Hall Studio-Library-Link Renovation project.  

The project consists of a Multi Phased renovation consisting of demolition, cast in place concrete, unit masonry repair and restoration, structural steel fabrications, rough and finish carpentry, waterproofing, sealants, metal wall panels, fireproofing, joint sealants, doors and hardware, aluminum storefronts, glazed curtain walls, gypsum board assemblies, interior finishes, fire sprinkler systems, pluming, hvac and electrical.

Work Begins
May 20, 2020
Expected Completion
Aug 01, 2020
Bids Due
Apr 16, 2020
Scope of Work

The sope of the project include renoations to multiple sets of restrooms.  Work is to proceed no later than May 20th and conclude no later than August 1, 2020.  There are liquidated damages associated with the project.

Work Begins
May 26, 2020
Expected Completion
Nov 29, 2021
Bids Due
Apr 08, 2020
Scope of Work

The project consists of the construction of approximately 7,200 square feet of new addition, 15,400 square feet of heavy renovation and 33,000 square feet of light renovation.  Please review the specifications as there are multiple alternates and unit prices required on this project.

Work Begins
May 20, 2020
Expected Completion
Aug 01, 2020
Bids Due
Apr 07, 2020
Scope of Work

This project consists of the renovation of the existing Family Consumer Science rooms and two existing restroom groupings at the Seward High School.  This includes, but is not limited to; selective demolition, construction of walls, floors, mechanical systems, electrical systems and interior finishes.  Work is scheduled to begin on May 20, 2020 and be substantially complete by August 1st, 2020Please pay special note to the bid form as there is a plumbing unit price and alterates which require pricing each of these three locations separately by all

Work Begins
May 12, 2020
Expected Completion
Jul 31, 2020
Bids Due
Apr 09, 2020
Scope of Work

THe scope of the work includes renovation to the chancel platform as well as finishes to the sancturary.  Work is to proceed in MId May and complete by July 31st.