Online Plan Room

Online Plan Room

Welcome to our online Plan Room. Please see the bid opportunities below and click on indivdual listings to see more specific details about each. Once you have had an chance to review the details of the project please indicate your bid intent by choosing “YES” or “NO” on each of the opportunities listed. If you have any further questions or need any assistance with our Online Plan Room please call 402.477.6745 or email bids@cheeverconstruction.com for assistance. 

Private Bid Opportunites

User login

Public Bid Opportunites
Bids Due
Sep 09, 2019
Work Begins
Oct 01, 2019
Bids Due
Sep 17, 2019
Scope of Work

Cheever Construction will be bidding as General Contractor for the construction of the 100 Bed Dormitory Facility at the Nebraska State Penitentiary. 

Construction of 100 bed dormitory will take place inside the secure fence perimeter.  The new building is approximatelly 12,200 sf in area, the building consists of grade beam footings with Pre Cast Structural Wall Panels, bar joist and deck roof structure, interior masonry walls, metal stud and drywall finishes, acoustical ceilings, interior finishes, site utilities, mechanical and electrical systems.

Work Begins
Oct 01, 2019
Expected Completion
Jan 31, 2019
Bids Due
Sep 17, 2019
Scope of Work

Cheever Construction is bidding as prime contractor for Stanton Optical located at 4320 North 27th Street (27th and Superior).  Work includes complete renovation of the approximate 2,000 square foot interior and limited renovation of the exterior site.  AT THTE REQUEST OF THE OWNER, PLEASE SEPARATE ALL EXTERIOR WORK FROM INTERIOR WORK ON YOUR BID RESPONSE.

Work Begins
Oct 14, 2019
Expected Completion
Jan 15, 2021
Bids Due
Sep 19, 2019
Scope of Work

Cheever Construction Company will be accepting bids for the Ambulatory Surgical Center (ASC) Remodel project.  This project will consist of the complete renovation and remodel of approximately 38,000 square feet on 3 levels of the exising 1730 building.  Please reference drawings A0.1 and A0.2 regarding construction phasing that will be required to accomodate hospital occupancy.  Further details and notes regarding phasing and temporary systems are shown on the project documents.  Please be sure to visit the existing site conditions to review any additional information a

Work Begins
Sep 23, 2019
Expected Completion
Aug 07, 2020
Bids Due
Sep 10, 2019
Scope of Work

Cheever Construction is the prime contractor for the UNL LUtheran Center- Additions and Renovations project located at 535 North 16th Street.  Work includes multiple additions, new electrical service, HVAC replacement, and complete renovation to the existing facility, .  Total footage of the completed project is approximately 22,000 square feet.  Work is to begin immediately and complete before the Fall Semester of 2020.  Plans are available online or limited sets are available for a $125.00 refundable deposit from A&D Techincal - 402-474-5454.